Bitcoin Miner Marathon Tests BTC Mining With Methane Gas From Waste Landfill
Submitted by Anonymous (not verified) on Thu, 11/02/2023 - 15:10
The 280 Kilowatt (kW) pilot project in Utah is already operational.